CABIN 1.8: CRAWL SPACE EXCAVATION - PHASE 2
With the primary excavation completed it is now time to take control of the crawl space. What does that mean?
It means getting control of the structure, the building systems (sanitary sewer) water supply, air movement (ducting) and framing of new and existing openings for crawl access.
The first priority was the structure.
The photo above is the finished column to beam connection below the guest room floor.
With this phase of the structural work done it was time to move on to the plumbing and sanitary waste line - that will be the next blog entry.
It means getting control of the structure, the building systems (sanitary sewer) water supply, air movement (ducting) and framing of new and existing openings for crawl access.
The first priority was the structure.
Beam at left to be replaced |
It helps to have a friend like Duane to assist |
New Beam and columns. |
With this phase of the structural work done it was time to move on to the plumbing and sanitary waste line - that will be the next blog entry.