ADA ACCESSIBILITY DESIGN
Ago Studios was commissioned to develop a series of accessibility solutions for a resort hospitality property in Avon, Colorado - at the base of the Beaver Creek ski area - to include accessibility ramps between multiple levels in this major property.
EXISTING CONDITIONS BEFORE ADA RAMP
Feature 1
The insertion of new ramps into the existing space required careful coordination with existing building systems including structural columns and foundation systems.
RAMP CONCEPT FROM LOBBY TO ATRIUM
CONCEPT RENDERING NEW ADA RAMP
Feature 2
Multiple spaces were reviewed to address accessibility improvements to comply with the requirements of the 2010 ADA.
RAMP CONCEPT FROM LOBBY TO ATRIUM
CONSTRUCTED ATRIUM RAMP
Feature 3
PROJECT DATA / CONSIDERATIONS
- Accessibility upgrades per 2010 ADA
- Minimal interference with existing circulation
- Glass and steel detailing
- Coordination of interior materials with existing spaces and materials
- Construction documents
- Construction observation